igus offers free plant shutdown inspections this summer

Written by  PEM Staff Friday, 18 June 2010
b_200_0_16777215_0___images_stories_2010_igus-plantinspections.jpgigus has announced that its engineers are once again available to examine cable carriers and continuous-flex cables free of charge during plant shutdowns this summer.

Those involved with maintenance or production are invited to take advantage of the free inspections to help reduce the risk of production downtime due to cable failure. igus experts are available for on-site appointments from 8 a.m. to 8 p.m. EST, Monday through Friday, based on availability.

igus cable carriers and continuous-flex cables are available from stock, so replacement parts can normally be delivered in time for installation during the same shutdown.

Call 1-800-521-2747 or e-mail This e-mail address is being protected from spambots. You need JavaScript enabled to view it to arrange a site visit with an igus expert.
www.igus.com

Add comment


Security code
Refresh


  • PEM Maintenance Award: Hamilton Port Authority As the busiest port on the Canadian side of the Great Lakes-St. Lawrence Seaway navigation system, the Port of Hamilton plays an integral role in supporting trade between Canada and the U.S. as well as overseas destinations. With thousands of jobs dependent on the cargo that is transported in and out of this port, one 12-person maintenance team is responsible for ensuring a variety of buildings, warehouses and infrastructure remain in good working order year-round.

    Check out the full story in the March/April 2013 issue of PEM.
    View video...
  • More Videos...
    PEM on Twitter
    Twitter